[kml_flashembed publishmethod=”static” fversion=”8.0.0″ useexpressinstall=”true” movie=”cityAnimation1.swf” width=”1000″ height=”300″ targetclass=”flashmovie” play=”true” loop=”true”]

Get Adobe Flash player

[/kml_flashembed]

5 Step System

Regular testing is the key to early detection, safety and reliability. tmuk’s five-step system helps to eliminate the tragic consequences of workplace electrical accidents and the industrial implications that follow.

Step 1: Check

All inventory items first undergo close visual inspection for signs of wear, damage or abnormalities that may render any of them unsafe.

Step 2: Test

Deep testing is then carried out via our mobile state-of-the-art appliance test station which immediately reports any safety issues. The test station records the real-time test results including description and details of the item tested, updates your inventory and automatically books the next testing date.

Step 3: Tag

Items that pass testing are tagged to identify and visually confirm the safety compliance and testing cycle. Failed equipment is immediately identified with a hazard warning tag and management is immediately notified. TMUK can perform repairs as requested.

Step 4: Data Transfer

A full description on the items tested including real-time results is downloaded to TMUK’s central computer data base. This provides an up-to-date secure electronic record of your organisation’s electrical assets. Testing reports are securely stored in our dedicated TMUK so that the complete safety history of all your electrical equipment can be instantly recalled.

Step 5: Report

Concise reports of the exact tests results are provided via your choice of hard copy, CD-ROM or TMUK secure web site. These reports contain detailed information of electrical assets including bar code number, item location, description, test date, next test date, test results and much more.

Leave a Reply